[SMM Lithium Carbonate Spot Assessment: LC2407 main contract rose, up 3.47%]

Published: Feb 21, 2024 18:14
Source: SMM
On February 21, the lithium carbonate 2407 main contract rose, up 3.47%. Data showed that the lithium carbonate 2407 main contract opened at RMB 92,700/mt, closed at RMB 96,900/mt, with trading volume of 324,538 lots and open interest of 165,643 lots, down 7,512 lots from the previous trading day. SMM’s assessment of spot battery-grade lithium carbonate prices were RMB 93,300-99,000/mt, averaging RMB 96,150/mt, down RMB 600/mt from the previous working day. The trend shows that after opening, lithium carbonate prices oscillated and held steady before surging significantly towards the end of the session, briefly touching the daily high of RMB 103,000/mt before falling back. After the noon opening, the main contract oscillated steadily for a period before declining slightly in oscillation, eventually closing up 3.47%.

On February 21, the lithium carbonate 2407 main contract rose, up 3.47%. Data showed that the lithium carbonate 2407 main contract opened at RMB 92,700/mt, closed at RMB 96,900/mt, with trading volume of 324,538 lots and open interest of 165,643 lots, down 7,512 lots from the previous trading day. SMM’s assessment of spot battery-grade lithium carbonate prices were RMB 93,300-99,000/mt, averaging RMB 96,150/mt, down RMB 600/mt from the previous working day. The trend shows that after opening, lithium carbonate prices oscillated and held steady before surging significantly towards the end of the session, briefly touching the daily high of RMB 103,000/mt before falling back. After the noon opening, the main contract oscillated steadily for a period before declining slightly in oscillation, eventually closing up 3.47%.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
1 hour ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
1 hour ago